Highlights
As seen from the Aquarium
East Bay on ramp
The Last Shark Fin
Closing the main span gap
Paving the bridge
The last stay cable
Opening Events
Engineering Challenges
Stories of Bridge Folks
Erecting Steel
Building Bridge Blog

Engineering Challenges - a closer look at the main span construction

2004-01-01
Overview and links: Cable Stay Bridges

2004-05-09
My first bicycle adventure to get a closer look

2004-05-15
Adding shark-fin edge girders

2004-05-23
Lateral tendons and the elevator

2004-06-06
Lateral tendons

2004-06-27
Progress as seen from my bicycle

2004-07-04
Counterweights as the mainspan grows

2004-07-08
Hurricane cables

2004-07-11
Adding floor girders

2004-07-21
Freyssinet: Building a stay cable

2004-08-01
Hurricane cables and a possible test

2004-08-08
Building the 7th set of stay cables

2004-08-22
Building the 8th set of stay cables

2004-08-29
Dreding the channel

2004-09-01
Placing the final triple shark fin girder

2004-09-12
Stay cables and Hurricane anchors

2004-09-19
East and West approach piers

2004-09-25
Capping piers and extending the main span

2004-10-03
Capping the east pier

2004-10-17
Adding the triple fin girder on the east back span

2004-10-29
A visit to High Steel, Lancaster Pa.

2004-11-01
Closing the gap between the west backspan and west approach

2004-11-14
X marks the spot

2004-12-12
Joining the east approach to the east backspan

2004-12-12
Morning sun

2004-12-16
Night work on the main span

2004-12-19
God's early monring sun kisses our new bridge

2005-01-23
One more edge girder to go!

2005-01-26
High Steel: Drilling and reaming the last splice plate

2005-02-04
Sandblasting the towers

2005-02-13
Last edge girder gap

2005-02-19
Marvin and Lori: Bridge workers will do anything to be first to cross the gap

2005-02-23
The last gap - North and South sides

2005-02-23
Phillip and the Last Dinosaur Standing

2005-03-05
Hydraulic jacks and moving the bridge

2005-03-06
Early morning work on the traveler

2005-03-08
Freyssinet injecting cables

2005-03-08
Installing the last splice plate

2005-03-10
Unbuilding the west tower crane

2005-03-10
Installing floor panels

2005-03-12
Pouring the last concrete

2005-03-19
Main span curvature

2005-04-08
Ungrowing the east tower crane

2005-04-12
Ungrowing the east tower crane

2005-04-23
The curvature of the main and back spans

2005-04-30
The traveler - a ride under the bridge

2005-05-16
Wind dynamics over the diamond towers

2005-06-10
Final painting of the anchors